Project Cases

Coalescer Oil Separator for Phase III of the Iraq Maysan Oilfield Water Treatment Plant EPC Project

Coalescer Oil Separator for Phase III of the Iraq Maysan Oilfield Water Treatment Plant EPC Project

Iraq Maysan Oilfield Water Treatment Plant Phase III EPC Project – Inclined Plate Oil Separator

Iraq Maysan Oilfield Water Treatment Plant Phase III EPC Project – Inclined Plate Oil Separator

Jiangsu Oilfield Biological Desulfurization Unit

Jiangsu Oilfield Biological Desulfurization Unit

Algeria TFT Gas Field Project

Algeria TFT Gas Field Project

Jiannan Project – Gas Desulfurization Unit

Jiannan Project – Gas Desulfurization Unit

PetroChina Changqing Oil and Gas Research Institute Fracturing Flowback Treatment Project, with a treatment capacity of 4,800 m³/day.

PetroChina Changqing Oil and Gas Research Institute Fracturing Flowback Treatment Project, with a treatment capacity of 4,800 m³/day.

PetroChina Jilin Oilfield Branch Fracturing Flowback Treatment Project, treatment capacity: 360 m³/d

PetroChina Jilin Oilfield Branch Fracturing Flowback Treatment Project, treatment capacity: 360 m³/d

Sinopec Jiangsu Oilfield Branch’s Fumin Combined Station Water Injection Project for Cleaning, Modification, and Wastewater Treatment, with a processing capacity of 2,500 m³/day.

Sinopec Jiangsu Oilfield Branch’s Fumin Combined Station Water Injection Project for Cleaning, Modification, and Wastewater Treatment, with a processing capacity of 2,500 m³/day.

The wastewater treatment project at the Qingxi Station of PetroChina’s Qinghai Oilfield Branch has a treatment capacity of 360 m³/day.

The wastewater treatment project at the Qingxi Station of PetroChina’s Qinghai Oilfield Branch has a treatment capacity of 360 m³/day.

Sinopec Chunfeng Oilfield, Block 601-20: Capacity Development Project for a 1 × 130 t/h Coal-Fired Steam Injection Station

Sinopec Chunfeng Oilfield, Block 601-20: Capacity Development Project for a 1 × 130 t/h Coal-Fired Steam Injection Station

PetroChina Dagang Oilfield Cangzhou Wangguantun Wastewater Treatment Plant Project, with a treatment capacity of 2,000 m³/day.

PetroChina Dagang Oilfield Cangzhou Wangguantun Wastewater Treatment Plant Project, with a treatment capacity of 2,000 m³/day.

CNOOC Lishui 36-1 Onshore Natural Gas Terminal Project, Capacity: 120 × 10^4 m³/d

CNOOC Lishui 36-1 Onshore Natural Gas Terminal Project, Capacity: 120 × 10^4 m³/d

CNOOC Kenli Oilfield Cluster Dongying Crude Oil Terminal Production Area and Utility Engineering Project

CNOOC Kenli Oilfield Cluster Dongying Crude Oil Terminal Production Area and Utility Engineering Project

Fiber-ball filter project in the utility operations area of China National Petroleum Corporation Asphalt Co., Ltd., with a treatment capacity of 7,680 m³/d.

Fiber-ball filter project in the utility operations area of China National Petroleum Corporation Asphalt Co., Ltd., with a treatment capacity of 7,680 m³/d.

Qingpingchuan Oil Production Plant of Yan Chang Oilfield Co., Ltd. – Filtration Water Injection Project; Treatment Capacity: 2,200 m³/d

Qingpingchuan Oil Production Plant of Yan Chang Oilfield Co., Ltd. – Filtration Water Injection Project; Treatment Capacity: 2,200 m³/d

Zichang Oil Production Plant of Yan Chang Oilfield Co., Ltd. – Raw Water Treatment Project, with a treatment capacity of 500 m³/day.

Zichang Oil Production Plant of Yan Chang Oilfield Co., Ltd. – Raw Water Treatment Project, with a treatment capacity of 500 m³/day.

< 123 > 跳转到 页

All rights reserved: Yangzhou Lvdou Environmental Engineering Equipment Co., Ltd.

Business license